Projects

LOCATION PROJECT
Grande Prairie, Alberta 17,000 Inch Comp. Station
LOCATION PROJECT
Swan Hills , Alberta Tank Farm
LOCATION PROJECT
Dawson Creek, B.C. Project No:. 1886
Parkland, Alberta 5000m of 10” incl. risers & pig barrels
Dawson Creek, B.C. Multiple P/L projects
LOCATION PROJECT
Grande Prairie, AB Pipeline and Facility Construction
Grande Prairie, AB 2500 DWI Wellsite and Miscellaneous Pipeline
Grande Prairie, AB Compressor Installation
Grande Prairie, AB Multiple Well Site Construction
LOCATION PROJECT
Bruderheim, Alberta 2,300m of 12”, 2,600m of 20”
Bruderheim, Alberta HDPE Fire Water System
Bruderheim, Alberta Bruderhiem Plant Expansion
LOCATION PROJECT
Cold Lake, Alberta Foster Creek Expansion
Foster Creek, Alberta Structural and Field Fabrication
Cold Lake, AB Winter Abandonment Program
Christina Lake, AB Installation of MW1 Sales oil Pipeline
Cold Lake, AB Foster Creek Expansion Project
LOCATION PROJECT
Dawson Creek, B.C Pad 101 & 102 Infill Projects
LOCATION PROJECT
Surmont Plant, Alberta Extensive Plant Work
LOCATION PROJECT
Alberta Multiple Facility and Pipeline Projects
Saskatchewan Multiple Facility and Pipeline Projects
LOCATION PROJECT
Bonneville, Alberta Iron River 5‐4 Pipeline Installation
LOCATION PROJECT
Grande Cache, Alberta 1,450m of 6”
Grande Cache, Alberta Resthaven 09‐03‐060‐02 W6M
Dawson Creek, B.C Duel wellsite tie-in
Dawson Creek, B.C 3400m of 12”,1700m of 8”&2”, 1400m of 8”
Dawson Creek, B.C Multiple P/L & Facilities
Grande Prairie, AB SCLH Gathering System Phase 3 Pipelines
Dawson Creek, B.C EnCana Pipestone Pipeline
Dawson Creek BC EnCana Tower 2 Pipeline
Fox Creek, AB West End Riser Project including Mechanical Construction
Fox Creek, AB 6 well pad install and tie-ins
Fox Creek, AB 8 Well pad install and tie-ins
LOCATION PROJECT
Waskada, Manitoba 105km of 8” P/L
LOCATION PROJECT
Edmonton AB EWP’s for Area 450 Surge System
Edmonton AB Base Line Terminal ESRT Connection
Edmonton AB Civil and Mechanical Construction for Baseline Tank Terminal
LOCATION PROJECT
Macoun Saskatchewan 105000m of 4” , 80000m of 8”
LOCATION PROJECT
Dawson Creek, B.C. 2,200m of 8”
LOCATION PROJECT
Devon, AB Multiple Facility and Pipelines Projects Since 2015
LOCATION PROJECT
Dawson Creek, BC Pipeline Riser Repairs
LOCATION PROJECT
Ft. Saskatchewan, AB Multiple Pipeline Projects
LOCATION PROJECT
Fox Creek, Alberta Multiple 4,6, & 8” P/L’s
LOCATION PROJECT
Edson, AB 8,810 M of NPS 6″ Pipeline
Edson, AB 12,500 M of 10″ Pipeline
LOCATION PROJECT
Grande Prairie, Alberta 10,700m of 8”
Central Alberta Peace NGL Pump Station
Grande Prairie, Alberta 600m of 16” 2×12”, 8” & 6”
Grande Prairie, AB Kakwa River Sales Gas Interconnect Pipeline
Ft. McMurray , AB 20 ” Tie-in’s
Fox Creek, AB Installation of 3 mainline pumps, new plant construction
Grande Prairie, AB Green Field Pump Station Construction
Grande Prairie, AB LeGlace 3 Plant Expansion
Ft. McMurray, AB Construction of new Horizon pump station
Ft. McMurray, AB Construction of new AOSPL Pump Station
Ft. McMurray, AB Construction of new House River Pump Station
Boyle, AB Construction of new Boyle Pump Station
LOCATION PROJECT
Stoughton, Saskatchewan 12 km of 6” P/L
Stoughton, Saskatchewan Multiple Fiberglass P/L’s
Drayton Valley, Alberta 17km of 4, 6” P/L
LOCATION PROJECT
Waskada, Manitoba 11km of 8”
LOCATION PROJECT
Grande Prairie, AB 28 km of 24″, 5km of NPS 24″ & 6″ with 2 Major HDD
LOCATION PROJECT
Hinton, Alberta 9000 inch Comp. Station
LOCATION PROJECT
S.E. of Hinton, Alberta 16,000m of Dual 8”
LOCATION PROJECT
Grande Prairie, AB Elmworth Wellsite construction and associated Pipeline Construction
LOCATION PROJECT
Fox Creek, Alberta 7.5 km of 6”